First of all, the approach to the formation of the main document of the organization of transportation activities – the train schedule has changed.

The balance of interests of passengers of high – speed, passenger and suburban trains with the interests of shippers and consignees is put in the first place when developing schedules for various categories of freight trains.

Synchronization of the timing of the introduction of a new timetable and the approval of the annual budget of JSC “Russian Railways” eliminated many problems of inconsistency of their parameters. Now these key documents begin to act simultaneously, and not with a gap of six months, as it was before.

The created traffic management vertical has consistently reformed the transportation management system. Traffic control centers have appeared, where today all the necessary means and technologies of traffic control are concentrated within the boundaries of roads. This made it possible to significantly reduce the load on the dispatching apparatus. Thanks to new information systems, the average length of dispatching stations has increased by almost a third.

However, in order to further improve the quality of transportation activities, new, landfill technologies were needed, the first step of which was the creation of seven traction resource management centers. Their task, at the current stage, was to work out the principles of managing the locomotive fleet on elongated shoulders and create end-to-end technology no longer within the boundaries of roads, but at longer technological ranges. Today, the principles of landfill management are planned to be implemented on other important elements of the transportation process – routing of car traffic, end-to-end technology for conducting “windows”, a plan for the formation and organization of train traffic.

At the same time, at all stages of technological transformations, the most important role belongs to railway stations as a key management link. It is here that the production processes of all verticals are connected into a single whole – traffic, infrastructure, traction, service provision, therefore, the powers and responsibilities of station managers as managers and coordinators should be strengthened.

Marshalling yards, which were called route factories by our grandfathers, were, are and will be the basis for the uninterrupted operation of the network. This definition is still relevant today.