In the fenced area, where, by the way, paths had already appeared, seedlings, trees were planted, a fence and other details were put up, at first there were 6 buildings of the linear accelerator connected to each other, therefore, they looked like one building 20 meters long and 84 meters wide, then 3 interconnected buildings were already built behind it, also 20 meters long, and when all 6 buildings in a row are completed, 120 meters wide and finally, another identical row with the same width and length. Behind him was the conference hall itself.

The entire hall inside had 4 floors connected to each other, while 2 of them were submerged underground, and 2 went upstairs. This hall was 90 meters wide and slightly smaller than the previous row of buildings, and 50 meters long. That is, it had an area of 4500 square meters, while if the stage occupied 1/8 of the total area or 562.5 square meters, then 3937.5 square meters remained, that is, 1968 people could already fit on the first floor, and almost as many on the subsequent floors, in total, 7875 people fit in this hall, which was simply stunning given the height of the hall of about 12 meters!

Both existing small printers were used to build this hall. With the same wall thickness of 1 m and a floor height of the same meter and a layer width of 10 cm, it was initially necessary to pass over an area of 450 km, while moving the structure. Further, for walls 50 meters long and as much as 20 meters high, 200 km are spent, and for walls 90 meters long, 360 km are spent, and 450 km for the roof. For floors with an area of 3937.5 square meters or with a width of 90 meters and a length of 43.75, it will be necessary to spend 393.75 km for one floor or 1181.25 km for 3 floors, for a total of 2641.25 kilometers.

As a result, it would take 15 hours 40 minutes and 30.27 seconds for one printer to create this hall, but since 2 such devices worked, the building was completed in 7 hours 50 minutes and 15.13 seconds.

So far the work has progressed at such a pace that the first model was ready at 5 o'clock in the morning, the second at 8 o'clock in the morning, then the large model was completed at 12 o'clock in the afternoon, and all the small buildings were already built at 10 o'clock in the afternoon, since 2 printers were working together . Then they began to create a conference room and by six o'clock in the evening they had completed. By that time, three large buildings had already been built and more were under construction. Then, by 3 pm, the second “cube” was ready, which started work when the first one completed 3 buildings, as already mentioned, and together with it by 5 pm they completed all 6 large buildings for cyclotrons.