The problem of industrial implementation of intelligent information systems capable of processing data with their inherent a priori uncertainty in railway transport is becoming more and more urgent. In many cases, the data is not only inaccurate and uncertain, but also incomplete, and sometimes unreliable. The development of methods that allow obtaining reliable conclusions based on such data is another direction for fundamental research.

4 AUTOMATED DISPATCH CENTERS AS INTEGRATED INTELLIGENT TRANSPORTATION PROCESS MANAGEMENT SYSTEMS

Currently, the development of various automated control systems in railway transport is increasingly taking place in the direction of their intellectualization. As a rule, intelligent railway systems are created to control individual processes.

World experience shows that the greatest effect is achieved when developing and implementing an integrated interconnected complex of intelligent systems. In this case, a unified information support is created, the mutual influence of managed processes is taken into account.

General integration principles

An illustrative example of the need to create an integrated complex of intelligent systems is the existing network (TCC) and regional (RTCC) automated dispatch control centers. There are dozens of automated workstations (AWSs) in various areas of organization of the transportation process, maintenance and repair of infrastructure and rolling stock devices, as well as security. Each AWS as a human-machine system performs a specific target function. However, a full-fledged interconnection of these functions can be carried out only with the integrated construction of a complex of intelligent dispatch systems. In principle, we can talk about a unified intelligent system in automated dispatch control centers. Let’s consider this provision in relation to regional (road) control centers – RTCC.

In each RTCC, a hierarchical dispatching structure solves tasks of three main types:

1) ensuring loading in accordance with the daily and current loading plans;

2) ensuring the passage of trains (including those performing local work) in accordance with the traffic schedule, the formation plan and the plan for the transfer of wagons along internal and external joints with unconditional compliance with traffic safety;